The kitchen is due to be fitted and cannot be put off anymore now. Before it can be done the floor needs to be sorted out.
The picture above is the floor with the leveling compound down, there is a slight slope from south to north but this is the best we could get it. They started to lay the tiles and it became very apparent that the walls are not square!
It was a messy job but the larger tiles really worked.
Just a short update but watch this space as the kitchen is now being fitted.



No comments:
Post a Comment