With the kitchen floor being completed just in time the kitchen arrived ready to be fitted. There were a few grumbles from the team as they lugged the kitchen over the footbridge and into the cottage. I think the 140Kg range cooker was the most testing.
They team left the fitter to get on with the job and what a great job he's doing.
This morning the tiling took place and it is starting to come together.
Still some work to do yet but below is a reminder of what this looked like around this time last year.
Follow the ups and downs of a couple and their dream of owning a cottage by the river. Watch as the cottage is transformed from an empty shell into a cosy home. See the changing seasons in the garden and orchard as well as getting to know the animals.
Saturday, 15 November 2014
Tuesday, 11 November 2014
Kitchen Floor just in time
The kitchen is due to be fitted and cannot be put off anymore now. Before it can be done the floor needs to be sorted out.
The picture above is the floor with the leveling compound down, there is a slight slope from south to north but this is the best we could get it. They started to lay the tiles and it became very apparent that the walls are not square!
It was a messy job but the larger tiles really worked.
Just a short update but watch this space as the kitchen is now being fitted.
The picture above is the floor with the leveling compound down, there is a slight slope from south to north but this is the best we could get it. They started to lay the tiles and it became very apparent that the walls are not square!
It was a messy job but the larger tiles really worked.
Just a short update but watch this space as the kitchen is now being fitted.