Bathroom space now complete

With the floor now in the next job was to get the stud wall in place. Without the stairs everything had to be carried up the ladder.


It was all looking good until Phil (the project manager) noticed it was 20mm out of place as the joiner had forgotten to take the plaster board into account.  So it had to be moved.




The small plinth is where the hot water store will sit, it will weigh around 300 Kg when full so needs to be strong. This was what the delay was all about.


We can now measure up the floor and decide what will fit into the bathroom.