Not much has been going on over the past couple of weeks, but we now have a bathroom floor in place. The bathroom is going to be where the stairwell used to be.
All the beams apart from the 3 shown in the photo above were taken out as these were sound there was no point in removing them. We were left like this for a few weeks as the floor layout was quite complicated due to getting the position of the thermal store correct.
Further beams were put in including a double joist to cope with the 300Kg weight of the store and for the stairs to hang off it.
There was then a conversation about floor boards or plywood, and as you can see we went for ply.
Hopefully we will have stairs soon.